Highmark Print Shop

Highmark needed close temperature and humidity control to insure their 35,000 square foot high-volume print production facility would operate flawlessly. This was the fourth high production print facility that the engineers at Enginuity would be involved with from a design, maintenance or re-engineering standpoint. Enginuity was responsible for temperature and humidity systems and controls as well as compressed air system design and installation.

Technologies employed: DDC controls, variable speed fans, pumps and air compressors, Fabric duct system, atomizing humidification, reverse osmosis water treatment.