Portfolio Category: Industrial

Lindt Chocolate

PROJECT BACKGROUND In 2014, Lindt USA, a 170-year-old Swiss chocolatier, leased a 450,000 square-foot warehouse in South Middleton Township, Cumberland County to house its third distribution center and second Lindt USA retail factory store. The warehouse/distribution building required tightly controlled temperature and humidity conditions. Enginuity designed customized mechanical and plumbing solutions, installing this massive project…
Read more

Norfolk Southern Bridge

In 2013, Norfolk Southern selected Enginuity for a major project at its Lucknow Rail Yard in the Harrisburg, PA. In order to accelerate the transitions of train crews, a bridge was erected over several tracks, with new fuel and oil lines running the span. This 160 foot bridge, which was preassembled including the 3” thru 10”…
Read more

Highmark Print Shop

Highmark needed close temperature and humidity control to insure their 35,000 square foot high-volume print production facility would operate flawlessly. This was the fourth high production print facility that the engineers at Enginuity would be involved with from a design, maintenance or re-engineering standpoint. Enginuity was responsible for temperature and humidity systems and controls as…
Read more

Hershey Kit Kat Piping

The Hershey Next Century Project was introducing a new product line and Enginuity was selected to run process piping that would help move liquid Chocolate as well as other process material. The job involved a lot of prefabrication and custom piping work, and is a perfect example of our industrial and food-service experience. In an effort…
Read more